School campuses in River Ridge
River Ridge carries several of the best-known campuses on the East Bank, and their projects run through the summer break. A River Ridge campus job wants a fenced bank near the maintenance drive, serviced early and out of the drop-off loop. Roofing and chiller replacement are the usual River Ridge summer work, and both run several weeks.
Term time in River Ridge is tighter than summer. Once classes resume a River Ridge unit needs screening and a service call before arrival, so we build the route to have the truck gone before the first bus.
Churches, halls and River Ridge weekends
River Ridge parish halls host fairs, suppers and receptions through most of the year, and the placement is always beside the hall door on pavement. We collect a River Ridge weekend order on Monday, since our own week closes Saturday evening. Sizing a River Ridge order is about doors, not numbers. A River Ridge committee that tells us where people will actually line gets units in the right place first time.
Oaks, levee and the River Ridge ground
River Ridge sits on the natural levee under a heavy oak canopy, and low branches decide where a service truck can get to as much as the driveway does. We walk a River Ridge approach before the first delivery rather than discovering a low limb the hard way.
Behind the ridge the ground drops and holds water, so a River Ridge unit off the pavement goes on plank. Summer takes any River Ridge crew job to twice weekly service from June onward, and the handwashing stand gets refilled on the same River Ridge visit.
