Street and utility work through Harahan
Harahan has spent years replacing water and sewer lines under streets that were never wide to begin with. A Harahan utility job closes half a block, and the unit has to sit where a resident still reaches a driveway and the truck can still stop. We set a Harahan unit on the closed side, upstream of the plates, and move it forward with the cut.
Residents notice everything here. A Harahan crew that keeps the unit tidy and out of a sight line gets far less grief, and so do we.
Levee path, rail and Harahan access
The levee path along Harahan draws walkers and cyclists all day, and levee or floodwall work here needs the unit up on the crown road rather than at the toe. We keep a Harahan levee unit clear of the path itself so nobody detours around it. The rail line is the other Harahan constraint. A Harahan crossing job puts the unit behind the barricade well off the track, and we confirm which Harahan street is open before the driver sets out.
Ground, drainage and the Harahan calendar
Harahan sits on the natural levee with slightly better ground than most of the parish, but the back streets still drain slowly and a Harahan yard near the drainage servitude stays wet. We plank a Harahan setting on grass and keep off the soft shoulder entirely, which matters most on the Harahan blocks closest to the drainage canal.
The seasons set the rest of the Harahan year. Harahan crews work hard through spring, and from June we go to twice weekly service on any Harahan job with a full crew, because heat and humidity here do not negotiate.
